February 2019
Millwall Docks taken during the winter heatwave of February 2019. Although this was taken at 8:30am in the morning the light was already becoming too strong, however the docks were perfectly still hence the clarity of the reflections. Buildings featured here are Ability Place, One Canada Square, Pan Peninsula, South Quay Plaza and One Park Drive under construction, and Baltimore Tower on the right.